Plastic pipe work




Plastic pipe work



















The common defects to plastic pipe

Impact damage during installation

The Pipes can easily break

Can crack easily due to pressure.




Materials
·      Plastic pipe 15mm x 25m £70 (1)
·      90 degree pipe coupling 15mm £5 (1)
·      Straight pipe coupling 15mm £5 (1)
·      Equal tee fitting and inserts 15mm £10 (2)
·      Plastic pipe inserts £2 (10)



The defects and limitations of

·      It is very flexible

·     We have different types of sizes



Tools
·      Buckets
·      Rench
·      Dust sheets
·      Screw driver (flathead)
·      PVC plastic grip cutters




PPE
·      Boots
·      Gloves
·      Goggles



Risk assessment

Sharp pipe ends may cause cuts (low risk)
Cutting finger using PVC cutters (medium risk)

We wear correct PPE. To prevent these risks from happening. To stop cutting your fingers when like cutting they pipe keep hands away and always on handles and keep away form they blade. Then last wear gloves or fill then end of pipe so you don’t cut your self, we are working to they health and safty act of 1974.



Method statement

We first got our PPE on, and then we made way to the area of work and seen the problem. So we looked and found the main water simply, trend it off after we put a bucket under the component joint from the pipe and tock it out. We got the pipe and cut to about 50mm with a par of PVC grip cutters. Refitted back in place and testes for any leaks then finished (plus clearance).    






Quote

Dear customer

We have inspected the plastic pipe work and found a split in a section of the plastic piping

We turned of the water form the pipe that was leaking and put a bucket under to stop water from going everywhere and a dustsheet to protect it from spreading over the area.

Next we had a look at the components we are needed and the way to reinstall it.

We cut a of pipe to the same size and then resouldered the fitting and then put it back in place.

Then we test to see any leaks and problems then finished and pack away (plus clearness).



 Times

6 hours

Cost

The cost of all the materials and labour will cost £540

 
    Materials £120
    Labour £20 per hour
    Overheads (petrol,PPE,permit) £200
Total cost £540