Site Daily Report
CNO:
001980
|
Title:
Work Shop Refurbishment
|
Date:
11.2.13
Manager
: Lewis bridge
|
TRADE
|
LAB
|
|
Plastering
|
Bradley, Blake, Taylor, Christan, Michael and Ryan
|
In progress
|
Mixing plaster
|
Ash and Matt
|
In progress
|
Filler
|
Sam
|
On going
|
Architrave
|
Jordan , Ryan and Sam
|
In progress
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
WEATHER:
|
TIME LOST: N/A
|
Work
in Progress:
|
Plastering : Bradley, Blake,
Taylor, Christan, Michael, Ryan are
all plastering exterior of bays 13 to 16 then inside of
bays are 2 and 10 then work stop as no had not another plaster but
kept on using what we had.
Architrave: Jordan is doing
outside architrave on bays 18 to 20. Then Sam and Ryan took over as Jordan
had lesson.
Filler: Sam going around
filling inside bays has done bay
6,7,20,18 and 3
|
VISITORS
|
Billy: On a lunch brake and wearing PPE.
|
CNO:
01980
|
Title:
Work Shop Refurbishment
|
Date:14.02.13
Manager:
Taylor Measor
|
TRADE
|
LAB
|
PROGRESS
|
Unibond / plastering
|
Blake, brad, Michael, Chris.
|
In Progress
|
Mixing plaster
|
Harley and Ryan
|
On Going
|
Architrave/ skirting
|
Sam and Lewis
|
In Progress
|
|
|
|
|
|
|
WEATHER: Sunny with clouds
|
TIME LOST: N/A
|
Work
in Progress:
|
Michael has done his second coat on every wall apart from
one. Chris disappeared after break but he did get one wall plastered with a
second coat. Blake has done his second coat on two walls, but has also done his
first coat on another wall. Brad has also done his second coat but on three
walls and a first coat on another wall. Sam has architrave bays 5, 7, 17, and
repaired bays 18 and 19; remarkably he has also marked out bays 6, 9, 10, 11,
and 12 already for architrave to be attached. Lewis has architrave bays
4,6,8,13,14, 15,16,6,9,10,11 and 12 While Harley and Ryan mixed up plaster for
the plasterers with expert timing to insure no wastages of plaster. Harley also
helped plaster.
VISITORS
|
Mitchell Macdiamrid and Alex plastering in bays 14 and 15
|
Materials
|
Contract C: 001980
|
Title: Work Shop
Refurbishment
|
Week Ending: 11.2.13
|
Manager: Taylor Measor
& Lewis Bridge
|
DATE:
|
MATERIAL:
|
quantities
|
11.2,13
|
25Kg bag of plaster
|
1
|
11.2.13
|
Filler bag
|
1
|
11.2.13
|
Pine Architrave 15x45x2100mm
|
2
|
|
|
|
14.2.13
|
Pine Architrave
15x45x2100mm
|
7
|
14.2.13
|
25Kg bag of plaster
|
3
|