Site Daily Report
CNO:
01980
|
Title:
Work Shop Refurbishment
|
Date:25.02.13
Manager:
Billy Mogford
|
TRADE
|
LAB
|
PROGRESS
|
Unibond / plastering
|
Blake, brad, Michael, Ryan, Taylor, Harley.
|
In Progress
|
Mixing plaster
|
Blake and Michael
|
On Going
|
Architrave/ skirting
|
Sam and Lewis
|
In Progress
|
WEATHER: drizzly and cloudy
|
TIME LOST: N/A
|
Work
in Progress:
|
Ryan is on his last coat of plaster, he needs to finish
plastering on ceiling and bay wall. Had to leave (family matter). Blake has
finished mixing plaster with Michael. Brad has finished two walls and s now
smoothing them off. Sam has architrave every bay, only has one remaining. Lewis
has completed the same work as Sam. While Harley is plastering his walls still,
he is now up o his second coat.
CNO:
01980
|
Title:
Work Shop Refurbishment
|
Date:28.02.13
Joe
draper
|
TRADE
|
LAB
|
PROGRESS
|
Unibond / plastering
|
Blake, brad, Ryan, Taylor, Harley.
|
In Progress
|
Mixing plaster
|
Blake and Ryan
|
On Going
|
Architrave/ skirting
|
Sam and Lewis
|
In Progress
|
WEATHER: drizzly and cloudy
|
TIME LOST: N/A
|
Work
in Progress:
|
Ryan is on his last coat of plaster, he needs to finish
plastering on ceiling and bay wall. Blake has finished mixing plaster with Ryan.
Brad has finished two walls and s now smoothing them off. Sam has architrave
every bay, only has one remaining. Lewis has completed the same work as Sam. While
Harley is plastering his walls still, he is now up on his second coat. Ryan and
Billy are still plastering…
Brad and blake got a bag of plaster each.
CNO:
01980
|
Title:
Work Shop Refurbishment
|
Date:04.03.13
Blake
white
|
TRADE
|
LAB
|
PROGRESS
|
Unibond / plastering
|
Blake, brad,mike, Harley.
|
In Progress
|
Mixing plaster
|
Blake and brad
|
On Going
|
Architrave/ skirting
|
Sam and Lewis
|
In Progress
|
WEATHER: drizzly and cloudy
|
TIME LOST: N/A
|
Work
in Progress:
|
Blake, brad and mike finishing the second coats on the final
few bays so the plastering was finished during the plastering, Blake and brad
were mixing the plaster and the rest of the group were trying to get most of
the skirting board and dado done to get most of the work wood done. All of the
plastering was completed and some of the bays are fully completed with dado and
skirting.
CNO:
01980
|
Title:
Work Shop Refurbishment
|
Date:06.03.13
Blake
white
|
TRADE
|
LAB
|
PROGRESS
|
Unibond / plastering
|
Blake, brad,mike, Harley.
|
In Progress
|
Mixing plaster
|
Blake and brad
|
On Going
|
Architrave/ skirting
|
Sam and Lewis
|
In Progress
|
Cleaning site
|
everyone
|
|
WEATHER: drizzly and cloudy
|
TIME LOST: N/A
|
Work
in Progress:
|
As the last few bits of plastering was finished by Blake and
brad everyone else started to clean up the site, the cover on the floor and on
the inside of each bay was removed and all the rubbish swept up and all the rubbish was removed and put into the skip.
CNO:
01980
|
Title:
Work Shop Refurbishment
|
Date:11.03.13
Blake
white
|
TRADE
|
LAB
|
PROGRESS
|
Architrave/ skirting
|
Sam and Lewis,taylor
|
In Progress
|
Filling and sanding
|
Brad, mike and Billy,ash
|
In progress
|
WEATHER: drizzly and cloudy
|
TIME LOST: N/A
|
Work
in Progress:
|
Sam, Lewis and Taylor are continuing with the skirting and
dado on the inside of bays and Billy, brad, mike and ash are filling all wholes
on the inside and out side of bays ready for sanding.
Materials
|
Contract C: 001980
|
Title: Work Shop
Refurbishment
|
Week Ending: 01.03.13
|
Manager: joe draper
|
DATE:
|
MATERIAL:
|
quantities
|
25.02.13
|
Thistle multi finish plaster
|
2
|
28.02.13
|
More plaster
|
2
|
Contract C: 001980
|
Title: Work Shop
Refurbishment
|
Week Ending: 01.03.13
|
Manager: joe draper
|
DATE:
|
MATERIAL:
|
quantities
|
25.02.13
|
Thistle multi finish plaster
|
2
|
28.02.13
|
More plaster
|
2
|