This is a weekly repot of what materials we used, any queries and a daily report, this will be every week to show the progresses of work and to keep eye on all stock and work going on.



Site Daily Report
CNO: 001980
Title: Work Shop Refurbishment
Date: 30.1.13
Manager : Ryan

TRADE
LAB

Protection
Lewis & Michael
completed
Remove existing P/B
Harley & Blake
completed
Stud Wall
Brad & Sam
completed
Floor Repair
Matt & Chris +
completed
Patch repair
Harley & Blake
completed
Plaster Boarding
Harley & Chris & Matt & Blake & Lewis & Michael
In progress





WEATHER:
TIME LOST:

Work in Progress:
Protection: Lewis and Michael almost completed protection they will then move onto plaster boarding.
Remove Old Plaster Board:  Harley & Blake completed bays: 3: two patch repairs, 7: right wall (small repair) 8: one left side wall and half of the right wall, 9: outside Cheek of bay, 13: two patch repairs boxing, 14: outside cheek of bay, 15: outside cheek of bay, 16: outside side wall and cheek of bay. Now filling in a patch repair.
Stud Wall: Brad & Sam
Floor Repairs: Chris & Matt are in progress of completing the task.
Bays need to be completed: (2,5,11,12,14,19,20) replacing missing board/s
Bay 6: Floor repair: uses a crow bar to take up a floor board and used a saw to cut through to make it easier to remove, once that floor board was removed we pushed back existing floor boards to close gaps in between each board.
Plaster Boarding is in progress.

VISITORS

Mitchell M: wanted to annoy John S, No PPE, DID NOT sign in.
Ashley Bean: accompanied Mitchell, No PPE, DID NOT sign in.



CNO: 01980
Title: Work Shop Refurbishment
Date:31.1.13
Manager: Sam Shrewsbury

TRADE
LAB
PROGRESS
Plaster boarding
Harley, Blake,  Ashley, Matt, Christian
Finished
Scrim / beading
Lewis, josh
Finished
Unibond / plastering
Christian, brad, Jordan, Michael, Blake
On going
Door frame
Lewis
In progress




WEATHER: Sunny with clouds
TIME LOST: N/A

Work in Progress:
Bay 1 has been left for the time being as the ironmongery work is complete.
Bay 2 has been scrimmed and beaded by Lewis in preparation for plastering
Bay 3 has been filled today as there was some chips in the walls
Bay 4 has been has been scrimmed by Lewis; Matt fixed one of the plasterboard repairs.
Bay 5 The door lining has been replaced by Lewis and I have checked to make sure its all plumb and level etc. it has been scrimmed, also the floor board needs replacing, Matt strengthened the plasterboard repair.
Bay 6 has had some of the repairs plastered to smooth the wall Christian has done the second coat
Bay 7 has had some of the repairs plastered to smooth the wall Christian has done the second coat
Bay 8 has been scrimmed by Lewis. The plastered board needed a few more screws to strengthen it and matt done this.
Bay 9 Harley has been working in this bay, he has added a piece of timber to screw plasterboard to and plaster boarded the whole bay, he has also cut a whole in one of the pieces for access to the light switch, he is also beaded and scrimmed this bay ready for plastering
Bay 10 has been scrimmed by Lewis  and is ready for plastering, some walls need a second coat the rest need starting
Bay 11 Ashley has plaster boarded two half walls and around some of the outside of the bay, This bay has also been beaded by Lewis
Bay 12 Brad has finished off his first coat of plaster and second coated / polished the majority of this bay
Bay 13 A small patch repair has been plastered and Christian has second coated the area to make the wall smooth
Bay 14  Brad and Blake began some first coats in and around this bay of plastering, Michael is doing a second coat on a bit of plasterboard repair
Bay 15 Jordan has done a second coat on the plasterboard repair and Christian has polished it, Lewis scrimmed this bay
Bay 16 Nothing has been done to this bay today
Bay 17 Christian has done a first coat of plaster on a small plasterboard repair
Bay 18 Christian has plastered the two big walls doing first and second coat, he also polished these walls down, Josh has beaded this bay
Bay 19 Jordan has done two of the walls in first coat
Bay 20 Christian put a first coat on two patch repairs in this bay
Blake, Brad, Harley, Michael, Lewis stayed behind 10 minutes into their break with me today to help use up the last of the mixed plaster, we plastered a few patch repairs and any small gaps we could see we put in a bit of plaster to fill the gap.
Lewis, Blake, Brad and Harley have begun filling any screw holes, cracks, chips etc. in the walls they can see.
Michael has been more of a labourer today and has mixed all the plaster, cleaned the buckets and although at times the plasters who finished the wall gave him some help he has managed to keep up with them and done well keeping a constant flow of plaster, he also helped second coat some patch repairs.
Josh has been a general labourer today and has been around helping people by getting more plaster, and put up some beading.
Harley and Matt has fixed the plasterboard around the outside of the bay, some bits my need tweaking.
Josh made a bin run today.

VISITORS

Mitchell Macdarmid: Trying to disrupt / disturb Ashley and Jordan. No ID but had PPE. 10:25-10:33, 11:43-11:51, 12:45-13:00
Nicola Sankey: Site visit from team leader to check progress. Had ID and PPE
Andy Benn: Had ID and PPE, come to see how we was getting on. 13:00-



 Materials

Contract C: 001980
Title: Work Shop Refurbishment

Week Ending: 31.1.13
Manager: Ryan Wakefield

DATE:
MATERIAL:
quantities
30.1.13
Dry wall screws – 3.5x25mm
1000
30.1.13
Floor board nails
100g
30.1.13
Roll of BPM
1
30.1.13
Duck tape
2
30.1.13
9.5mm plaster board
6
30.1.13
Floor board length 3.6mx90mmx19m
2
30.1.13
Buckets
1
30.1.13
CLS 62mmx38mmx2.4m
4
31.1.13
Scrim
1 roll
31.1.13
Skim beading galvanised 2.4M
7 lengths
31.1.13
Thistle multi finish plaster
5
31.1.13
Plasterboard 9.5mm
6
31.1.13
Par timber 125mmx25mmx5.5m
1
31.1.13
Dry wall screws – 3.5x25mm
1000




QUERY & INSTRUCTION SHEET
TO; John Symes
CONTRACT NO; 01980               WORKSHOP REFURBISHMENT
DATE;
QI NO;01

QUESTION: Today we found some un-noticed problems with the project. In our original Programme we have missed of the removal and replacement of a door frame and repairing several other door frames, we also didn’t allow for removing the coat hooks and shelves that where already in place.

ANSWER
In reference to the specification the door linings are noted and should have been picked up in your survey.

The specification dose not include for shelving or hooks.