The common defects to surfaces

·      Holes
·      Ruff texture
·      A lump on the wall

     

Materials

·      Sandpaper p80 115mm x 5m £25 (1)
·       Polyfilla Filler 2kg £15 (1)



The defects and limitations of surfaces

·      Different type of surfaces
·      Different type of grades of sand paper
·      Different type of fillers



Tools

·      Harris Continental Filling Knives 80,100 and 120mm
·      Bin
·      Dust pan and brush
·      Spot bored
·      Pole sander plate
·      Extension Pole 2m


PPE

·      Boots
·      Gloves
·      Goggles
·      Dust mask


Risk assessment

·      Cuts to hands
·      Inhaling dust
·      Any alleges

We wear correct PPE. To prevent these risks from happening. To stop cuts to hand wear thick gloves if you run hand over a sharp part in wall. Then wear a dust mask to stop dust getting in the lungs to stop any later in life problems with breathing and then if using filler or sanding down wear the right PPE if you have alleges to them. We are working to the health and safety act 1974.



Method statement

We first got our PPE on, and then we made our way to the area of the wall and looked for any part to fill with polyfilla filler. So we got out a spot bored and put the powder on and mixed to a smooth and good mix and applied to wall putting not to much on wall but a good bit so it fills the small indents and then leave to dry for a few good hours depending on how it is. Then when we come back we lightly sanded it down with a 80p grana of sandpaper and then made any last touches and packed away (plus clearances).



Quote

Dear customer


We have inspected your walls and they woodwork and found little dents and holes from when the plastering was done.

So we then made some filler up and filled in the holes and dents to any wall work or wood and left to set then sand lightly on the area so its smooth.

Then after we sand the hole wall and wood work lightly so it will be smooth for a cote of paint on it.

Then made any last touches and packed away (plus clearance).



 Time

6 hours


Cost

They cost of all the materials and labour will be £480


   Materials £40

   Labour £40 per hour
 
   Overhead (petrol,PPE,permit) £200



Total cost £480