The common defects to tiles
· Cracked in the middle of tile
· Chippings on sides
· Falling of all as damp behind wall
Materials
· White Tiles 150mm x 150mm x 8mm £10 (3 boxes)
· Tile adhesive 25kg £10 (1)
· Tile spacers 2mm £5 (1 bag)
· Water
The defects and limitations of tiles
· Different type of sizes
· Different type of colours
· Different type textures
Tools
· Tile cutter
· Tile gauge
· Bin
· Noted trowel
· Grout float
· Sponge
· Dust pan and brush
· White bored pen
· Grout rake
· Filler knife
PPE
· Boots
· Gloves
· Goggles
Risk assessment
· Cuts to hand when holding on cut tile side
· Shards of tile flying in eye when cutting
We wear correct PPE. To prevent these risks from happening. To stop cuts to hand wear thick gloves and keep it from skin if using the cut side, then to stop any shards of tile flying in to eyes wear safety goggles when cutting the tile. We are working to the health and safety act of 1974.
Method statement
We first got our PPE on, and then we made our way to the area were they tiles have fallen off wall because of water getting in throw gaps of tiles and washing the adhesive off making then fall off wall. So we tock all broken tiles away and dryad area and then propend the area were the existing tiles were and then started to apply the adhesive to wall and then fit with tile spacers to give the gap for grouting and also we cut tiles that needed to be cut before we start. Then we have to lave for a good few hours and then grout the gaps to finish. After all then we washed tiles to look nice then packed away (plus clearance).
Quote
Dear customer
We have inspected your tiled wall and you have broken and cracked tiles that need replacing in a few area of wall.
So we shall tack grout out with a grout rake and then push it off with a filler knife and then start to get all stuff together.
Then we prospered the background of wall and then apply adhesive to wall and fit same type tile on with spacers so is has room for the grout to fit.
After adhesive has gone off we shall apply grout and then start to finish up and pack away (plus clearance).
Time
6 hours
Cost
They cost of all the materials and labour will be £485
• Materials £45
• Labour £40 per hour
• Overhead (petrol,PPE,permit) £200
Total cost £485